DEACON HOUSE | SHEFFIELD
ENABLING WORKS
Strip out & Shell Refurbishment
£450k
6 Months
JCT Minor Works with Contractor’s Design
The Deacon House project in Sheffield was an enabling scheme on an 8 storey city centre office building. The project was successfully delivered over 6 months and included the following works:-
1. Asbestos Abatement
2. Internal strip out 37,000 sq/ft
3. Refurbishment of existing Crittal windows
4. Decoration of windows externally
5. Removal of all roof-mounted mechanical plant
6. Re-bedding of all perimeter coping stones
7. Extensive roof repairs
8. Renovation of the entire external facade
The building was surrounded by busy streets and pavements with bus stops to the front of the building and a small carpark to the rear. Therefore, Assix had to plan the project with vital thought to the protection of the public from falling debris/dust arising from our refurbishment works; which was mitigated by the construction of a scaffold crash deck and catch fans to the perimeter of the building.
There was a substantial amount of external works to be carried out at Deacon House, during the Autumn and Winter months over a relatively short duration. Assix, therefore, looked to implement a more effective access arrangement than using traditional scaffold throughout, which would have taken a significant time to erect and dismantle on a building 8 floors in height. Assix, therefore, proposed using a mix of access cradles and MEWPs in a phased arrangement to access all elevations of the building, which the client accepted as there were commercial advantages of using this method.
Assix effectively programmed the scheme to ensure continuity of works for the majority of trades, whilst maintaining maximum utilisation of the cradles, and a smooth transition as cradles were systematically moved to cover all aspects of the elevations.
As a consequence of the scope of works, there was a considerable amount of working at height involved in the scheme. The Assix site team strictly managed the working at height elements, ensuring that all operatives had undertaken specific training before using the cradles, permit to works were strictly enforced, risks were identified early, with all tasks being methodically planned, and that all operatives were fully conversant with their RAMS.
Assix identified that one of the significant critical path items on the scheme was the identification of concrete repairs required to the building envelope. They, therefore, proposed a strict timetable of inspections, carried out by Assix as soon as cradle had been moved to a new position. This information was then quickly issued to the client, to receive an instruction to pass to the repair sub-contractor. The management of this process was key to the successful delivery of this project.
Assix were appointed as Principal Contractor on this two-phased listed building refurbishment project.
Assix were appointed as Principal Contractor for the refurbishment of levels 0 - 4 of the DICe Building which is located on Clarendon Street, Nottingham within the NTU City Campus.
Assix were appointed as Principal Contractor for the refurbishment of multiple teaching & learning spaces during the summer of 2024
Working alongside the University of Sheffield to preserve and restore this important local landmark has been a tremendous privilege for ASSIX.
Assix were appointed as Principal Contractor for the refurbishment of Level 6 at the Western Bank Library building at the heart of the University Campus
Assix were appointed as Principal Contractor to complete this extensive facade refurbishment project for the University of Sheffield at their hexagonal Geography Building.
Assix were appointed as Principal Contractor for the refurbishment of multiple teaching & learning spaces during the summer of 2023
Assix were appointed as Principal Contractor to complete the replacement of three large atrium rooflights for the University of Sheffield at the Hadfield CBE Building. The works were completed under the protection of weather tents while the building was occupied and involved extensive services works.
Assix were appointed as Principal Contractor for the refurbishment of multiple teaching & learning spaces during the summer of 2022
Assix were appointed as Principal Contractor to complete a project of cast-iron heritage railing replacements and reconstruction of a listed retaining wall at Bartolome House.
Assix were appointed as Principal Contractor to complete the replacement of three large atrium rooflights for the University of Sheffield at the Hadfield CBE Building. The works were completed under the protection of weather tents while the building was occupied and involved extensive services works.
Assix were appointed as Principal Contractor following a competitive tender process to construct a new locker building for Derbyshire Police within the grounds of Ripley Police Station.
Assix were appointed as Principal Contractor to complete a large re-roofing project for the University of Sheffield at the Hadfield CBE Building. The complex works involved detailed phasing to maintain critical plant services within the building while facilitating the works.
Assix were appointed as Principal Contractor following a competitive tender process to carry out re-roofing to the Broad Lane Block housing the University’s Civil and Structural Engineering Department. The works were carried out above and within live teaching environments which required meticulously planned operations to complete the works safely and with minimal disruption. £600,000 project completed over 16 weeks.
Assix provided a full Construction Management service on this £325k car park extension & reconfiguration project for Univar & Ventgrove. The works in Bradford comprised extensive surface water drainage alongside new surfacing and electric vehicle charging point provision.
Assix completed Pre-Construction & Enabling Works Management Role for this £10m New Build Residential Project. Including development of project cost plan, programme & management of demolition and site remediation works.
Assix carefully delivered this office refurbishment project for an international chemical distributer in Wilmslow, Manchester.
Shell & Core Refurbishment of an 8 storey, 37,000 sq/ft city centre office building. Including roof repair, window refurbishment and concrete facade repairs.
Assix provided sub-contractor support services to take the Network Rail brief and translate into safe and workable solution in a rail workshop environment. Assix also provided estimating, procurement and change control management.
Assix provided sub-contractor support services to take London Underground brief and translate into safe and workable solution in rail workshop environement.
Assix provided sub-contractor support services to take the Network Rail brief and translate into safe and workable solution in a rail workshop environment. Assix also provided estimating, procurement and change control management.
The installation of a single storey double gable extension to provide new kitchen and garden room with existing kitchen and dining room subject to refurbishment to open up existing space and create a large dining and entertaining area